(EDGAR Online via COMTEX) -- ITEM 2. MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

OVERVIEW

PG&E Corporation is a holding company whose primary operating subsidiary is Pacific Gas and Electric Company, a public utility serving northern and central California. The Utility generates revenues mainly through the sale and delivery of electricity and natural gas to customers.

The Utility is regulated primarily by the CPUC and the FERC. The CPUC has jurisdiction over the rates, terms, and conditions of service for the Utility's electricity and natural gas distribution operations, electric generation, and natural gas transportation and storage. The FERC has jurisdiction over the rates and terms and conditions of service governing the Utility's electric transmission operations and interstate natural gas transportation contracts. The NRC oversees the licensing, construction, operation, and decommissioning of the Utility's nuclear generation facilities. The Utility is also subject to the jurisdiction of other federal, state, and local governmental agencies.

This is a combined quarterly report of PG&E Corporation and the Utility and should be read in conjunction with each company's separate Condensed Consolidated Financial Statements and the Notes to the Condensed Consolidated Financial Statements included in this Form 10-Q. It also should be read in conjunction with the 2019 Form 10-K.

Chapter 11 Proceedings

On the Petition Date, PG&E Corporation and the Utility filed voluntary petitions for relief under Chapter 11 in the Bankruptcy Court. PG&E Corporation's and the Utility's Chapter 11 Cases are being jointly administered under the caption In re: PG&E Corporation and Pacific Gas and Electric Company, Case No. 19-30088 (DM). For additional information regarding the Chapter 11 Cases, refer to the website maintained by Prime Clerk, LLC, PG&E Corporation's and the Utility's claims and noticing agent, at http://restructuring.primeclerk.com/pge . The contents of this website are not incorporated into this document.

For more information about the Chapter 11 Cases, see "Item 1A. Risk Factors - Risks Related to Chapter 11 Proceedings and Liquidity" and "Item 7. MD&A - Chapter 11 Proceedings" in the 2019 Form 10-K and Notes 2 and 5 of the Notes to the Condensed Consolidated Financial Statements in Item 1 of this Form 10-Q.

Going Concern

The accompanying Condensed Consolidated Financial Statements to this Form 10-Q have been prepared on a going concern basis, which contemplates the continuity of operations, the realization of assets and the satisfaction of liabilities in the normal course of business. However, PG&E Corporation and the Utility suffered material losses as a result of the 2017 Northern California wildfires and the 2018 Camp fire, which contributed to the decision to file for Chapter 11 protection. As a result of these challenges, such realization of assets and satisfaction of liabilities are subject to uncertainty. For more information about the 2018 Camp fire and 2017 Northern California wildfires, see Note 10 of the Notes to the Condensed Consolidated Financial Statements and the 2019 Form 10-K.

Management has concluded that uncertainty regarding these matters raises substantial doubt about PG&E Corporation's and the Utility's ability to continue as going concerns, and their independent registered public accountants included an explanatory paragraph in their auditors' reports which states certain conditions exist which raise substantial doubt about PG&E Corporation's and the Utility's ability to continue as going concerns in relation to the foregoing. The Condensed Consolidated Financial Statements do not include any adjustments that might result from the outcome of this uncertainty. For more information about these matters, see Notes 1 and 2 to the Condensed Consolidated Financial Statements and the 2019 Form 10-K.

Summary of Changes in Net Income and Earnings per Share

PG&E Corporation's net income available for common shareholders was $371 million in the three months ended March 31, 2020, compared to $136 million in the same period in 2019. In the three months ended March 31, 2020, PG&E Corporation recognized additional base revenues authorized in the TO20 rate case, as compared to the same period in 2019.

Key Factors Affecting Financial Results

PG&E Corporation and the Utility believe that their financial condition, results of operations, liquidity, and cash flows may be materially affected by the following factors:

The Outcome of the Chapter 11 Cases. For the duration of the Chapter 11 Cases, PG&E Corporation's and the Utility's business is subject to the risks and uncertainties of bankruptcy. For example, the Chapter 11 Cases could adversely affect the Utility's relationships with suppliers and employees which, in turn, could adversely affect the value of the business and assets of PG&E Corporation and the Utility. PG&E Corporation and the Utility also have incurred and expect to continue to incur increased legal and other professional costs associated with the Chapter 11 Cases and the reorganization. At this time, it is not possible to predict with certainty the effect of the Chapter 11 Cases on their business or various creditors, or whether or when PG&E Corporation and the Utility will emerge from bankruptcy. PG&E Corporation's and the Utility's future financial condition, results of operations, liquidity and cash flows depend upon confirming, and successfully implementing, on a timely basis, a plan of reorganization. Although PG&E Corporation and the Utility have entered into settlement agreements to resolve the claims of the major classes of claimholders, including Utility debtholders, individual wildfire victims, holders of subrogated insurance claims and certain public entities, claimholders not party to a settlement agreement may still be able to challenge and otherwise impede the Plan, including in the case of individual wildfire-related claimholders by voting against the Plan. These settlement agreements could be terminated under various circumstances, some of which are beyond PG&E Corporation's and the Utility's control. In addition, PG&E Corporation's and the Utility's ability to emerge from Chapter 11 is dependent on their ability to satisfy the conditions set forth in AB 1054, as determined by the CPUC. PG&E Corporation and the Utility believe the Plan meets the requirements of AB 1054 by, among other things, satisfying wildfire claims through settlements consistent with the terms of AB 1054, by keeping rates neutral, on average, for the Utility's customers, and by providing for the assumption of all power-purchase agreements, community-choice aggregation servicing agreements, and collective bargaining agreements. Finally, in order to emerge from Chapter 11, PG&E Corporation and the Utility must finance the Plan. There are numerous uncertainties related to such financings, including the ability to successfully raise equity or debt in the public or private markets, the ability to satisfy the terms and conditions set forth in the debt and equity commitment letters and the Noteholder RSA, the ability to collect insurance proceeds and the amount of additional capital that can be obtained to finance the Plan, including through securitization.

The Utility's Ability to Fund Ongoing Operations and Other Capital Needs. In connection with the Chapter 11 Cases, PG&E Corporation and the Utility entered into the DIP Credit Agreement, which was approved on a final basis on March 27, 2019. For the duration of the Chapter 11 Cases, PG&E Corporation and the Utility expect that the DIP Credit Agreement, together with cash on hand and cash flow from operations, will be the Utility's primary source of capital to fund ongoing operations and other capital needs and that they will have limited, if any, access to additional financing. In the event that cash on hand, cash flow from operations, and availability under the DIP Credit Agreement are not sufficient to meet liquidity needs, PG&E Corporation and the Utility may be required to seek additional financing, and can provide no assurance that additional financing would be available or, if available, offered on acceptable terms. The amount of any such additional financing could be limited by negative covenants in the DIP Credit Agreement, which include restrictions on PG&E Corporation's and the Utility's ability to, among other things, incur additional indebtedness and create liens on assets.

The Impact of the 2018 Camp Fire, 2017 Northern California Wildfires and the 2015 Butte fire. PG&E Corporation and the Utility face several uncertainties in connection with the 2018 Camp fire, 2017 Northern California wildfires and the 2015 Butte fire, related to:

the amount of possible loss related to third-party claims (as of March 31, 2020, the Utility's best estimate of probable loss in connection with the 2018 Camp fire, 2017 Northern California wildfires and 2015 Butte fire was $25.5 billion), which amount is subject to change based on a number of factors, including whether existing settlements are upheld, whether any termination events are triggered under these agreements, whether the classification and treatment of claims in the Plan is successfully challenged by claimholders who are not party to a settlement agreement, whether punitive damages, fines and penalties are treated as specified in the Plan, whether the Plan is confirmed, and whether the requisite number of impaired wildfire claimholders vote to approve the Plan in the Chapter 11 Cases;

the outcome of the Wildfires OII, including whether the settlement agreement, as amended, is approved by the CPUC and the Bankruptcy Court;

the impact of other investigations, including criminal, regulatory, and SEC investigations;

the ability of PG&E Corporation and the Utility to finance costs, expenses and other possible losses in respect of claims related to the 2018 Camp fire and the 2017 Northern California wildfires, through securitization mechanisms or otherwise; and

the amount and recoverability of clean-up and repair costs, including as may be limited by the outcome of the Wildfires OII (the Utility incurred costs of $1.21 billion for clean-up and repair of the Utility's facilities through March 31, 2020).

(See Notes 4, 10, and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and Item 1A. Risk Factors in Part II.)

The Impact of the 2019 Kincade Fire. Claims related to the 2019 Kincade fire will not be discharged in connection with emerging from Chapter 11. Accordingly, if PG&E Corporation or the Utility were determined to be liable for the 2019 Kincade fire, such liabilities could be significant and could exceed the amounts available under applicable insurance policies, which could be expected to have a material impact on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity and cash flows.

The Uncertainties in Connection with Any Future Wildfires, Wildfire Insurance, and AB 1054. While PG&E Corporation and the Utility cannot predict the occurrence, timing or extent of damages in connection with future wildfires, factors such as environmental conditions (including weather and vegetation conditions) and the efficacy of wildfire risk mitigation initiatives are expected to influence the frequency and severity of future wildfires. Although the financial impact of future wildfires could be mitigated through insurance, the Utility may not be able to obtain sufficient wildfire insurance coverage at a reasonable cost, or at all, and any such coverage may include limitations that could result in substantial uninsured losses depending on the amount and type of damages resulting from covered events. In addition, the policy reforms contemplated by AB 1054 are likely to affect the financial impact of future wildfires on PG&E Corporation and the Utility should any such wildfires occur. The Wildfire Fund would be available to the Utility to pay eligible claims for liabilities arising from future wildfires and would serve as an alternative to traditional insurance products, provided that the Utility satisfies the numerous conditions to the Utility's participation in the Wildfire Fund set forth in AB 1054 and that the Wildfire Fund has sufficient remaining funds.

However, the impact of AB 1054 on PG&E Corporation and the Utility is subject to numerous uncertainties, including the Utility's eligibility to access relief under the Wildfire Fund (which is dependent on, among other things, the Chapter 11 Cases being resolved by June 30, 2020 pursuant to a plan or similar document not subject to a stay and the Utility making its initial contribution thereto), the Utility's ability to demonstrate to the CPUC that wildfire-related costs paid from the Wildfire Fund were just and reasonable, and whether the benefits of participating in the Wildfire Fund ultimately outweigh its substantial costs. The Utility may not be able to finance its required contributions to the Wildfire Fund, which consist of an initial contribution of approximately $4.8 billion and annual contributions of approximately $193 million. Finally, even if the Utility satisfies the eligibility and other requirements set forth in AB 1054, for eligible claims against the Utility arising between July 12, 2019 and the Utility's emergence from Chapter 11, the availability of the Wildfire Fund to pay such claims will be capped at 40% of the amount of such claims.

The AB 1054 Deadline of June 30, 2020. In the event that PG&E Corporation and the Utility are unable to confirm a plan of reorganization by June 30, 2020, the Utility will not be eligible to participate in the Wildfire Fund established under AB 1054. In that scenario, the Utility (i) would be unable to seek payment from the Wildfire Fund for liabilities arising from wildfires occurring after the July 12, 2019 effective date of AB 1054 (which in the case of pre-emergence wildfires, such as the 2019 Kincade fire, would be limited to 40% of such liabilities in excess of $1 billion), (ii) would not receive the benefit of the 20% disallowance cap contemplated by AB 1054, (iii) would not be required to make any contributions to the Wildfire Fund, (iv) in applications for cost recovery for wildfires occurring after July 12, 2019, would nevertheless be subject to review under the "just and reasonable" standard set forth in section 451.1 of the Public Utilities Code (i.e., the standard as modified by AB 1054) and (v) may still be eligible to obtain the annual safety certifications contemplated by section 8389 of the Public Utilities Code (which has implications for the burden of proof in a proceeding for cost recovery under section 451.1 of the Public Utilities Code).

The Impact of the COVID-19 pandemic. PG&E Corporation's and the Utility's financial condition, results of operations, liquidity and cash flows have been (for the months of March and April 2020) and will continue to be significantly affected by the outbreak of COVID-19. The principal areas of near-term impact include liquidity, financial results and business operations, stemming primarily from the ongoing economic hardship of the Utility's customers, the moratorium on service disconnections and an observed reduction in non-residential electrical load. The Utility is in the early stages of evaluating the overall impact of the COVID-19 pandemic; however, the Utility expects a significant impact on monthly cash collections as long as current circumstances persist. This impact to liquidity may be partially offset by reductions in discretionary capital spending or potential regulatory or payroll tax policy changes. As of March 31, 2020, PG&E Corporation and the Utility had access to approximately $4.6 billion of total liquidity comprised of approximately $1.5 billion of Utility cash, $0.4 billion of PG&E Corporation cash and $2.7 billion of availability under the DIP Credit Agreement. Other potential impacts of COVID-19 on PG&E Corporation and the Utility include operational disruptions, workforce disruptions, both in personnel availability (including a reduction in contract labor resources) and deployment, delays in production and shipping of materials used in the Utility's operations may also adversely impact operations, a reduction in revenue due to the cost of capital adjustment mechanism, the potential for higher borrowing costs due to the increasing difference in the higher yield of lower-rated debt as compared to the lower yield of higher-rated debt of similar maturity and incremental financing needs. For more information on the impact of COVID-19 on PG&E Corporation and the Utility, see "PG&E Corporation's and the Utility's financial condition, results of operations, liquidity and cash flows could be significantly affected by the outbreak of the COVID-19 pandemic" and "Market conditions resulting from the outbreak of COVID-19 may hinder PG&E Corporation's and the Utility's exit financing to emerge from Chapter 11" in Item 1A Risk Factors in Part II.

PG&E Corporation and the Utility expect additional financial impacts in the future as a result of COVID-19. PG&E Corporation and the Utility's analysis of the potential impact of COVID-19 is preliminary and subject to change.

The Uncertainties Regarding the Impact of Recent and Future Public Safety Power Shutoffs. The Utility's wildfire risk mitigation initiatives involve substantial and ongoing expenditures and could involve other costs. The extent to which the Utility will be able to recover these expenditures and potential other costs through rates is uncertain. The PSPS program, one of the Utility's wildfire risk mitigation initiatives outlined in the 2019 Wildfire Mitigation Plan, has been the subject of significant scrutiny and criticism by various stakeholders, including the California Governor, the CPUC and the court overseeing the Utility's probation. On November 12, 2019, the CPUC issued an order to show cause why the Utility should not be sanctioned for alleged violations of law related to its communications with customers, coordination with local governments, and communications with critical facilities and public safety partners during the PSPS events in late 2019. On November 13, 2019, the CPUC instituted an OII to examine 2019 PSPS events carried out by California's investor-owned utilities and to consider enforcement actions. In addition, the PSPS program has had an adverse impact on PG&E Corporation's and the Utility's reputation with customers, regulators and policymakers and future PSPS events may increase these negative perceptions. In addition to the 2019 PSPS events, the Utility expects that PSPS events will be necessary in 2020 and future years. (See "OIR to Examine Utility De-energization of Power Lines in Dangerous Conditions" in "Regulatory Matters" below.)

In addition, the proposals of SB 378, which would impose penalties and other requirements on electric utility companies relating to PSPS events, could have a material effect on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows. In addition to other requirements, SB 378 would impose on an electric utility company a civil penalty of at least $250,000 per 50,000 affected customers for every hour that a PSPS event is in place, would require the CPUC to establish a procedure for customers, local governments and others to recover costs accrued during a PSPS event from the electric utility company, which cost recovery would be borne by shareholders, and would prohibit an electric utility company from billing customers for any nonfixed costs during a PSPS event. Further, the proposals of AB 1941 could have a material effect on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows. AB 1941 proposes to suspend RPS requirements, determine the savings to electric utility companies from the suspension and direct those savings towards system hardening to mitigate wildfire risks and PSPS impacts, and would prohibit salary increases or bonuses to executive officers during the suspension of RPS requirements. In addition, on April 13, 2020, a group of local governments and associations filed a Joint Motion for Emergency Order Regarding De-Energization Protocols During the COVID-19 Pandemic, requesting that the CPUC issue an emergency order setting forth de-energization protocols for the Utility and other investor-owned utilities that will remain in place for as long as a State of Emergency or shelter-in-place order remains in effect due to the COVID-19 pandemic. The requested requirements include providing back-up generation to essential services and allowing local governments to veto PSPS events for their areas. The Utility and other entities (including the other IOUs) filed responses on April 20, 2020, requesting that the CPUC deny the motion, and the moving parties and other entities filed responses on April 24, 2020. A CPUC decision could restrict or impose additional requirements on the Utility in implementing PSPS events. PG&E Corporation and the Utility are unable to predict the timing and the outcome of this request.

The Costs of Other Wildfire Mitigation Efforts. In response to the wildfire threat facing California, PG&E Corporation and the Utility have taken aggressive steps to mitigate the threat of catastrophic wildfires, the spread of wildfires should they occur and the impact of PSPS events. PG&E Corporation and the Utility incurred approximately $2.6 billion in connection with the 2019 WMP, and expect to incur approximately $2.7 billion in 2020 in connection with its 2020-2022 WMP. Although the Utility may seek cost recovery for certain of these expenses and capital expenditures, the Utility has agreed not to seek rate recovery of certain wildfire-related expenses and capital expenditures in future applications in the amount of $1.625 billion.

While PG&E Corporation and the Utility are committed to taking aggressive wildfire mitigation actions, if additional requirements are imposed that go beyond current expectations, such requirements could have a substantial impact on PG&E Corporation's and the Utility's financial condition, results of operations, liquidity and cash flows. The Court overseeing the Utility's probation in connection with the Utility's federal criminal proceeding has imposed numerous obligations on the Utility related to its business and operations, including full compliance with all applicable laws concerning vegetation management and clearance requirements, submission to regular, unannounced inspections by the Monitor of the Utility's vegetation management efforts and equipment inspection, enhancement and repair efforts and the maintenance of traceable, verifiable, accurate and complete records of the Utility's vegetation management efforts and monthly reports to the Monitor on the status and progress of vegetation management efforts. On April 29, 2020, the Court entered an order requiring, among other things, the Utility to materially expand its vegetation management program, including through the hiring of additional employees, and to implement a new inspection and record-keeping system for transmission towers. PG&E Corporation and the Utility also face uncertainties in connection with the amount and recoverability of enhanced and accelerated inspection costs of the Utility's electric transmission and distribution assets. (See "Order Instituting Investigation into the 2017 Northern California Wildfires and the 2018 Camp Fire" in Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1.)

The Outcome of Other Enforcement, Litigation, and Regulatory Matters, and Other Government Proposals. The Utility's financial results may continue to be impacted by the outcome of other current and future enforcement, litigation (to the extent not stayed as a result of the Chapter 11 Cases), and regulatory matters, including those described above as well as the outcome of the safety culture OII, the sentencing terms of the Utility's January 27, 2017 federal criminal conviction, including the oversight of the Utility's probation and the potential recommendations by the Monitor, and potential penalties in connection with the Utility's safety and other self-reports. (See Note 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1.) In addition, the Utility's business profile and financial results could be impacted by the outcome of recent calls for municipalization of part or all of the Utility's businesses, offers by municipalities and other public entities to acquire the electric assets of the Utility within their respective jurisdictions and calls for state intervention, including the possibility of a state takeover of the Utility. PG&E Corporation and the Utility cannot predict the nature, occurrence, timing or extent of any such scenario, and there can be no assurance that any such scenario would not involve significant ownership or management changes to PG&E Corporation or the Utility, including by the state of California.

The Timing and Outcome of Ratemaking Proceedings. The Utility's financial results may be impacted by the timing and outcome of its 2020 GRC, FERC TO18, TO19, and TO20 rate cases, and its ability to timely recover costs not currently in rates, including costs already incurred and future costs tracked in its CEMA, WEMA, FHPMA, WMPMA, and FRMMA that are incurred in connection with the Utility's 2019 WMP, the amount of which is approximately $2.6 billion, and 2020-2022 WMP, with costs of approximately $2.7 billion planned in 2020. The outcome of regulatory proceedings can be affected by many factors, including intervening parties' testimonies, potential rate impacts, the Utility's reputation, the regulatory and political environments, and other factors. The Utility's ability to seek cost recovery may also be limited by the outcome of the Wildfires OII. (See Notes 4 and 11 of the Notes to the Condensed Consolidated Financial Statements in Item 1 and "Regulatory Matters" below.)

The Utility's Compliance with the CPUC Capital Structure. The CPUC's capital structure decisions require the Utility to maintain a 52% equity ratio on average over the period that the authorized capital structure is in place, and to file an application for a waiver to the capital structure condition if an adverse financial event reduces its equity ratio by 1% or more. Due to the net charges recorded in connection with the 2018 Camp fire and the 2017 Northern California wildfires as of December 31, 2018, the Utility submitted to the CPUC an application for a waiver of the capital structure condition on February 28, 2019. The waiver is subject to CPUC approval. The CPUC's decisions state that the Utility shall not be considered in violation of these conditions during the period the waiver application is pending resolution. On April 1, 2020, the CPUC issued a Proposed Decision which if approved, would grant the waiver. A final decision on the Utility's application is expected to be voted out on May 7, 2020. On April 20, 2020, the CPUC also issued a proposed decision in the OII to Consider PG&E Corporation's and the Utility's Plan of Reorganization addressing this issue. (See "Regulatory Matters" below.)

For more information about the risks that could materially affect PG&E Corporation's and the Utility's financial condition, results of operations, liquidity, and cash flows, or that could cause future results to differ from historical results, see "Item 1A. Risk Factors" in this Form 10-Q and the 2019 Form 10-K. In addition, this quarterly report contains forward-looking statements that are necessarily subject to various risks and uncertainties. These statements reflect management's judgment and opinions that are based on current estimates, expectations, and projections about future events and assumptions regarding these events and management's knowledge of facts as of the . . .

May 01, 2020

(c) 1995-2020 Cybernet Data Systems, Inc. All Rights Reserved

This Story has 0 Comments
Be the first to comment

Story Conversation

Commenting FAQs »
Link to MarketWatch's Slice.